LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Manual Download >> Q01UCPU
MITSUBISHI Q01UCPU Programming Manual PLC Special Instructions Manual
Product model: Q01UCPU
Name: PLC
Brand: MITSUBISHI
Sort: Special Instructions Programming Manual
File language: English
Input voltage range: AC100-120V/AC200-240V.
Output voltage: DC5V.
Output power: 8.5A.
Simplified program debugging
Can use the software with the implementation of the conditions of the test function, any step in the program,
Changes the value of the soft component to a user specified value.
In the past, when debugging the specific loop process, the need to add a set of soft components of the program,
At present, through the use of the function, no need to change the program, you can make a specific loop program segment execution action Q01UCPU Manual Q01UCPU
Therefore, do not need to change the program separately in order to debug, debugging operation is more simple.
Auto backup key data
Save the program and parameter files automatically to the program memory (ROM Flash) without using the backup battery,
To prevent the loss of the program and the parameters due to forgetting to replace the battery Q01UCPU Manual.
In addition, the soft component data and other important data can be backed up to the standard ROM,
In order to avoid during the long holiday and other planned downtime,
The data is lost due to battery depletion Q01UCPU Manual.
The next time the power is turned on, the backup data will be automatically restored.
Through the expansion of soft components, more convenient to create the program.
M soft components and B soft components can be expanded to 60K points, making the program easier to understand MITSUBISHI PLC Manual. Cable length 5 meters.
Extended substrate for connection.Bidirectional thyristor output: 32 points.
Rated current and voltage: 240V ~ 0 MITSUBISHI PLC Manual. 6A/1 AC100 point, 2.4A/1 public end, 8 point 1 Public end.
Response time: 1ms+0.5 cycle.
External wiring connections: 38 terminals (terminals sold separately).
Replacement model: AY23.8 slots.
Requires 1 power modules.
Used to install the old section of the large A series PLC module MITSUBISHI PLC Manual.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized outpput mode Q01UCPU Programming Manual.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation Q01UCPU Manual.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
Related products