LK Automation Limited LK Automation Limited
Information sort OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Supply
A1S64TCTT-S1 MITSUBISHI A1S64TCTT-S1 Temperature control module


There are many A6TB models to different types of matching with the I/O module.
The cable can be connected to the I/O module of 32 points or 64 points by using the terminal row of the wire in advance.
These cables have a variety of lengths to be selected, so that
Using the module wiring and terminal is not only connected with the connector A1S64TCTT-S1. Cable length: 3 meterss.
Connection between FX1N-232-BD and FXCPU for GOT expansion board.
Number of channels: 4 channels.
Sensing methods and temperature range: R, K, J, T, S, B, E, N, U, L, PL, II,, Wre5-26,,, and A1S64TCTT-S1.
A1S64TC series component is a kind of temperature controller combined with ANS series CPU.
Components with temperature measurement input and built-in PID algorithm control output,
Can be used in a variety of temperature control occasions A1S64TCTT-S1.
Each component controls up to 4 loops at most,
Thermocouple input or PT100 3 wire temperature sensor input,
Control output switching signal for the output of the transistor,
BW is a signal with broken line detection function. Input points: 16 points MITSUBISHI A1S64TCTT-S1.
Voltage: DC100/110/125V.
Current: 2mA.
Response time: 20ms.
8 points / a common end.
Positive / negative sharing.
20 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation MITSUBISHI A1S64TCTT-S1.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive MITSUBISHI A1S64TCTT-S1.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed oof executing instructions A1S64TCTT-S1.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.

Related supply information