Input points: servo external signal 32 points, 8 axis.
Input mode: source / drain type.
Input and output points: 32 points.
Better user experience data recording function.
Easy to record, no need to program.
Simply through the special configuration tool wizard to easily complete the settings,
The collected data can be saved in CSV format to SD storage card MITSUBISHI PLC Programming Manual.
Can be effectively used to save the CSV file to facilitate the creation of a variety of reference materials,
Including daily reports, generate reports and general reports
Q01CPU
These data can be applied to the data analysis, tracing, etc..
To record the change of control data without missing.
Data can be collected in a time interval or in a millisecond time interval,
To record the change of the specified control data without any omission MITSUBISHI PLC Programming Manual.
Therefore, in the event of failure, can quickly determine the cause, the precise action analysis.Express PCI bus.
Support Japanese, English OS.
Master / local station sharing.
Support Ver.2 CC-Link version.
Province distribution network module in cabinet and device.
Link to connect the 64 stations when the fastest scanning time for 1 MITSUBISHI PLC Programming Manual. 2ms (rate 2.5Mbps).
According to the transmission distance, the transmission rate is selected from 2.5Mbps, 625kbps and 156kbps.
CC-Link/LT from the station does not need any parameter settings Q01CPU Programming Manual.
Only need to set up the transmission speed in the master module, you can use the remote I/O.
I/O control in the first class of open field network module Q01CPU Programming Manual.
CC-Link based on reliable field bus technology,
Able to transmit large number of bits data (such as ON/OFF information) and word data (such as analog information).
Consistency of CC-Link to maintain loop transmission,
And the cycle of transmission and information (instantaneous transmission) communication separately, so as to ensure the timeliness of Q01CPU Programming Manual.
Even if the information reaches saturation, it will not affect the link scan time.
Make the mixed data environment intelligent, to achieve a new manufacturing system IE CC-Link field network module.
Using Ethernet cables and connectors available on the market to reduce costs.
High speed communication capable of communicating with 1Gbps.
Improve the communication response, significantly shorten the cycle time.
Improve the performance of cycle data update. Reduces the transmission delay timme and the application of the synchronization waiting time Q01CPU Manual .
Data can be read or written to other station programmable controller.
Status of IE CC-Link field network can be confirmed by Works2 GX.
Can be in the Workss2 GX up and down the abnormal position, the cause of the exception, the event record,
So it can reduce the time of abnormal to resume normal operation MITSUBISHI PLC Programming Manual.