LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Manual Download >> A2USCPU-S30
MITSUBISHI A2USCPU-S30 Fundamentals Programming Manual
Product model: A2USCPU-S30
Name: PLC
Brand: MITSUBISHI
Sort: Fundamentals Programming Manual
File language: English
Input points: 16 points.
Input voltage and current: 3/7mA DC12/24V.
Input response time: 10ms.
16 point /1 a public side.
Positive pole sharing.
Output points: 12 points.
Output voltage: DC24V/AC240V, 2A/1 point, 5A/1 common end.
Output response time: 12ms.
Output type: relay output.
8 point /1 a public end, 3 point /1 a public end A2USCPU-S30 Fundamentals.
Independent contact.
36 point terminal station A2USCPU-S30
Control solenoid valve required I/O points by the action principle of the solenoid valve can be known,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points A2USCPU-S30 Fundamentals.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process A2USCPU-S30 Fundamentals.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor.
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points. Input points: 32 points.
Input voltage: DC12V/DC24V.
Current: 3/7mA.
Response time: 10ms.
16 points / a common end.
Positive pole sharing.
50 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program A2USCPU-S30 Programming Manual.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling A2USCPU-S30 Programming Manual.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
Related products
MITSUBISHI
CPU unit
A2ASCPU-S30
MITSUBISHI CPU unit A2ASCPU-S30
I/O points: 1024. Processing speed: sec/
MITSUBISHI
CPU unit
A2USCPU
MITSUBISHI CPU unit A2USCPU
Input and output points: 512 points. Inp