LK Automation Limited LK Automation Limited
Brand: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Go Back >> Product Catalogues
QE82LG MITSUBISHI QE82LG Measuring circuit number: 2 circuits Insulation monitoring module
Brand: MITSUBISHI
Name: Insulation monitoring module
Model: QE82LG
Measurement items: leakage current (Io), resistive leakage current (Ior).
Measuring circuit number: 2 circuits.
Insulation monitoring module for measuring leakage current.
Leakage current can be measured to ensure safety by monitoring the leakage current (Io), can detect the risk of electric shock.
Insulation state measurement of resistive leakage current (Ior) can be monitored continuously and continuously,
In order to continuously monitor the insulation aging status of the equipment.
Each measurement project can be carried out in the 2 phase of the alarm monitoring can be respectively on the leakage current (Io), resistive leakage current (Ior) for the 2 phase of the alarm monitoring,
No ladder diagram program. Alarm monitoring is divided into 2 stages of attention alarm and danger alarm.
A module can measure two circuits of a module can be two circuits on the same line in the same system type power measurement.
In addition, Works2 GX (1.90U version or higher version) can be used to easily set the parameters.
Leakage current (Io), resistive leakage current (Ior).

PCI bus.
Support Japanese, English OS.
SI/QSI/H-PCF/ broadband H-PCF cable.
Dual loop controller network (control station / common station).
Make the mixed data environment intelligent, to achieve a new manufacturing system IE CC-Link field network module.
Using Ethernet cables and connectors available on the market to reduce costs MITSUBISHI QE82LG.
High speed communication capable of communicating with 1Gbps QE82LG
Improve the communication response, significantly shorten the cycle time.
Improve the performance of cycle data update. Reduces the transmission delay time and the application of the synchronization waiting time.
Data can be read or written to other station programmable controller.
Status of IE CC-Link field network can be confirmed by Works2 GX MITSUBISHI QE82LG.
Can be in the Works2 GX up and down the abnormal position, the cause of the exception, the event record,
So it can reduce the time of abnormal to resume normal operation.
Province distribution network module in cabinet and device.
Link to connect the 64 stations when the fastest scanning time for 1.2ms (rate 2.5Mbps).
According to the transmission distance, the transmission rate is selected from 2 MITSUBISHI QE82LG. 5Mbps, 625kbps and 156kbps.
CC-Link/LT from the station does not need any parameter settings.
Only need to set up the transmission speed in the master module, you can use the remote I/O.Control axis: maximum 8 axes.
Greater flexibility MITSUBISHI Insulation monitoring module.
PLC control and motion control using independent CPU, optimize the system configuration.
More than 4 CPU modules can be freely selected in multi CPU system MITSUBISHI Insulation monitoring module.
MITSUBISHI SSCNET control function.
By using the high speed serial communication mode, we can easily construct the synchronization system of the servo motor.
The motion controller and the servo amplifier can be quickly connected by a connector, and the connection is simplified MITSUBISHI Insulation monitoring module.
Each 11 CPU can control up to 32 axes at the same time QE82LG.
Can control the small capacity from 10W to 55KW large capacity servo motor.
Through the use of digital oscilloscope function, can be used to control the power distance, speed, posittion and other motor information monitoring MITSUBISHI QE82LG. 32 point connector for pressing flat cable (40 pin connector.Compact flash memory card.
Capacity: 1GB bytes.


...More relevant models >>>>
Last one: QE8WH4VT
next one: QD35ID1