LK Automation Limited LK Automation Limited
Brand: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Go Back >> Product Catalogues
MITSUBISHI CL9-CNR-20 MITSUBISHI CL9-CNR-20
Brand: MITSUBISHI
Name: Connector for connecting movable cable
Model: CL9-CNR-20
No introduction

Output type: relay output.
Output points: 4 points.
OFF leakage current: -.
Output protection function: No.
Rated load voltage / current: DC30V/AC250V/2A.
External connection: 1 wire.
Screw terminal table type.
Minimum size of industry.
The connection object at a glance with terminal cover plate.
Input module for public end of positive pole and negative pole MITSUBISHI CL9-CNR-20.
Terminal table structure capable of connecting with 2 wire type sensor and load in the same condition CL9-CNR-20
Can be installed along the 6 direction. A pack of 20.
Applicable models:
AJ65SBTC - - - type remote I/O module.
AJ65VBTCU - - - type remote I/O module.
AJ65VBTCU- - type remote I/O module. Input type: DC input, negative public end.
Input points: 32 points MITSUBISHI CL9-CNR-20.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 3 wire.
Sensor connector type (E-CON type).
Using industry standard E-CON type.
Simple wiring through sensor connector.
When installing the module can choose to use the DIN guide rail or screw mounting.
3 wire sensor input. Screw, 2 piece type terminal
Thermocouple Input module MITSUBISHI CL9-CNR-20.
Number of channels: 4 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step MITSUBISHI Connector for connecting movable cable MITSUBISHI Connector for connecting movable cable.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction MITSUBISHI Connector for connecting movable cable.
Design control cabinet and the operating table and other parts of the electriccal wiring diagram and wiring diagram CL9-CNR-20.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program deesign and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced MITSUBISHI CL9-CNR-20.


...More relevant models >>>>
Last one: CL9-CNR-23
next one: CL9-TERM