According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
For some initial state display, etc..
Output points: 16 points.
Voltage: DC24V.
OFF leakage current: 0.1mA.
Output type: transistor output (type sink).
Response time: 2ms.
8 points / a common end.
20 point terminal station.
With short circuit protection.
With the surge absorber.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh MITSUBISHI AJ71AR21.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read
AJ71AR21
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program MITSUBISHI AJ71AR21.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive MITSUBISHI AJ71AR21.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference MITSUBISHI Network module. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC MITSUBISHI Network module.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear MITSUBISHI Network module. Cable for extended use in multiplexing unit.Input voltage range: DC110/125V.
Output voltage: DC5V.
Output current: 8A.
For Q4ARCPU.
The control module monitors the power supply, the error
CPU state,
And its own error state.
It sends out
Error signal a6raf and open the corresponding
Relay output.
I/O points is an important indicator of PLC.
Reasonable selection of I/O points can not only satisfy the control requirements of the system,
And the total investment of the system is the lowest.
The input and output points and types of PLC should be determined accordiing to the analog quantity and switch quantity of the controlled object,
Generally an input / output element to take up an input / output point AJ71AR21.
Taking into account the future adjustment and expansion,
In general should be estimaated on the total number of points plus the amount of spare 20%~30% MITSUBISHI AJ71AR21.
The following describes the centralized control system I/O points of the estimate.