MITSUBISHI inverter FR-A720 series.
Voltage level: 3 phase 200V.
Frequency converter capacity: 0.75KW.
Inverter output for the PWM wave, containing more harmonic.
Frequency conversion power sensor through the input voltage and current signals to exchange sampling,
Sampling value through cable, optical fiber and other transmission systems and digital input frequency conversion power analyzer,
The sampling value of the voltage and current is calculated by the digital input frequency conversion power analyzer,
It can obtain the parameters such as voltage effective value, current effective value, fundamental wave voltage, fundamental current, harmonic voltage, harmonic current, active power, fundamental wave power and harmonic power
GT2710-VTBA Output points: 16 points.
Voltage: AC100 ~ 240V.
OFF leakage current: 3mA.
Output type: bidirectional controlled silicon.
8 points / a common end.
20 point terminal station.
With short circuit protection.
With the surge absorber.
Each scanning process. Focus on the input signal sampling GT2710-VTBA. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read .
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeeting the control requiremeents,
Should consider the best performance to price ratio, a reasonable choice of PLC MITSUBISHI GT2710-VTBA.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation MITSUBISHI GT2710-VTBA.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
GT2710-VTBA Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=GT2710-VTBA&select=5