MITSUBISHI RS422/485 RS422/485
No PHOTO
MITSUBISHI RS422/485
Input points: 16 points.
Input voltage and current: 120V ~ 6mA AC100.
Input response time: 30ms.
16 point /1 a public side.
Output points: 16 points.
Output voltage: DC24V/AC240V, 2A/1 point, 4A/ common end.
Output response time: 12ms.
Output type: relay.
8 point /1 a public side.
50 point terminal station MITSUBISHI RS422/485.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor RS422/485
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal MITSUBISHI RS422/485.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points MITSUBISHI RS422/485.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian .
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be known,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points.
Horizontally placed cable.
Length: 550mm.
MITSUBIISHI PLC progrram simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram RS422/485 RS422/485.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
RS422/485 Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=RS422/485&select=5