Power: 15kw.
Voltage: 400V.
There are 100% braking torque output in continuous regeneration, which can correspond to the continuous regeneration operation of the pipeline control.
There is no need to install the braking unit for each frequency converter, which can reduce the comprehensive space and reduce the comprehensive cost MITSUBISHI HC-SFS202BG2 1/9.
Renewable energy can be used for other frequency converter, excess energy back to the grid, to achieve energy saving
HC-SFS202BG2 1/9 Type: MR-C type.
Symbol 10A for motor models: HC-PQ23.
Power supply voltage: single phase AC220V.
Drive: servo drive in the development of the premise of the frequency conversion technology,
Current loop in the drive,
Speed loop and position loop (frequency converter without the ring) have carried out a more precise control than the general frequency control technology and algorithm,
In function is also a lot stronger than the traditional servo,
The main point can be precise position control MITSUBISHI HC-SFS202BG2 1/9.
The control speed and position are controlled by the pulse sequence transmitted by the upper controller,
The internal algorithm of the driver and the faster and more accurate calculation and better performance of electronic devices to make it more superior to the inverter MITSUBISHI HC-SFS202BG2 1/9. Cable length: 10 meters.
For FXCPU (FX0, FX0S, FX0N, FX1S, FX1N, FX2N, FX2NC,) and GOT connection.
For FXCPU expansion board FX2N-422-B, FX1N-422-BD and GOT connection. A3VTS with additional floor.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Cenntralized output modee HC-SFS202BG2 1/9.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation HC-SFS202BG2 1/9.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
HC-SFS202BG2 1/9 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HC-SFS202BG2 1/9&select=5