LK Automation Limited LK Automation Limited
Brand Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Price
MITSUBISHI A6BSW-P-S7 A6BSW-P-S7
MITSUBISHI A6BSW-P-S7
Power: 75kw.
Voltage: 400V.
Purpose: high frequency braking resistor.
The braking ability provided by the braking capacity is larger than that provided by the external braking resistor.
Can also be connected without built-in brake transistor inverter.
Three types of discharge resistors are available MITSUBISHI A6BSW-P-S7.
Please select according to the required braking torque. Output points: 16 points.
Voltage: DC24V/AC240V, 2A/1 point, 8A/1 public end A6BSW-P-S7
OFF leakage current: 0.1mA.
Output type: relay output.
Response time: 12ms.
8 point /1 a public side.
20 point terminal station.
With the surge absorber.
CE certification.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor MITSUBISHI A6BSW-P-S7.
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal MITSUBISHI A6BSW-P-S7.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc . .
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process.
Control solenoid valve required I/O points by the action principle of the solenoidd valve can be known,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 outtput, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points A6BSW-P-S7 A6BSW-P-S7.
A6BSW-P-S7 Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=A6BSW-P-S7&select=5


...more relevant model market price >>>>
Related products
MITSUBISHI
Optical media conversion
A6BSW-P-S4
MITSUBISHI Optical media conversion A6BSW-P-S4
Self service IN, OUT: SI optical cale
MITSUBISHI
bypass switch
A6BSW-R
MITSUBISHI bypass switch A6BSW-R
Coaxial data link anomaly station. Exten
MITSUBISHI
Optical media conversion
A6BSW-P-S5
MITSUBISHI Optical media conversion A6BSW-P-S5
Self service IN, OUT: SI optical cale
MITSUBISHI
Optical media conversion
A6BSW-P-S3
MITSUBISHI Optical media conversion A6BSW-P-S3
Self service IN, OUT: SI optical cale