LK Automation Limited LK Automation Limited
Brand Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Price
MITSUBISHI GT1562-VNBD
MITSUBISHI GT1562-VNBD
AC input points: 32 points.
Input voltage and current: 120V ~ 10mA AC100.
Response time: 35ms.
16 point /1 a public side.
36 point terminal station.
Number of stations: 4 stops.
Compact remote I/O unit.
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system GT1562-VNBD
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system.
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved MITSUBISHI .
Q series PLC in the use of CC-Link function better,
And easier to use MITSUBISHI .
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc . .
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses.
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc.,
Information layer using the most common Ethernet.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA devices.
The Ethernet module has the function of Internet e-mail receiving and sending,
The user can send and receive the production information conveniently in any place of the world,
Build a remote monitoring management system.
At the same time, the use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information. Twisted pair cable.
Single bus.
MELSECNET/B (remote I/O station).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initiallization procedure . After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system MITSUBISHI GT1562-VNBD.
The main contents of the initialization program arre:: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc MITSUBISHI GT1562-VNBD. .
GT1562-VNBD Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=GT1562-VNBD&select=5


...more relevant model market price >>>>
Related products
MITSUBISHI
8.4 Inch Touch Screen
GT1265-VNBD
MITSUBISHI 8.4 Inch Touch Screen GT1265-VNBD
Series introduction: with a variety of i
MITSUBISHI
10.4 inch touch screen
GT1672-VNBD
MITSUBISHI 10.4 inch touch screen GT1672-VNBD
Series: multimedia and advanced features
MITSUBISHI
8.4 Inch Touch Screen
GT1562-VNBD
MITSUBISHI 8.4 Inch Touch Screen GT1562-VNBD
A series of high performance models that
MITSUBISHI
10.4 inch touch screen
GT1275-VNBD
MITSUBISHI 10.4 inch touch screen GT1275-VNBD
"Series introduction: with a variety of