MITSUBISHI inverter series: FR-A800.
Voltage level: three phase 400V.
Power: 315kw.
SLD converter rated current: 770A.
Structure and function: the rectification part is off type.
Type: CA.
Substrate coating: have.
To maximize the performance of the motor.
Advanced auto tuning function.
The newly developed PM motor auto tuning feature can be used to operate other manufacturers of PM motors (Yong Ci synchronous motors) in the sensorless state
HF-SE102BJW1-S100
Not only can drive MITSUBISHI induction motor and PM motor, but also can drive other manufacturers of induction motor and PM motor.
This means that you can reduce the cost of inventory and supplies MITSUBISHI HF-SE102BJW1-S100.
If the PM motor is produced by a IPM motor or other company using MM-CF, the starting torque is limited to 50%,
Even after tuning is not simple to use and positioning control of zero speed torque) induction motor and permanent magnet motor can be combined freely . DC input points: 2 points.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
2 point /1 a public side MITSUBISHI HF-SE102BJW1-S100.
Positive pole sharing.
Output points: 2 points.
Output voltage and current: DC24V .
Output response time: 2ms.
2 point /1 a public side.
Output form: transistor output, leakage type.
16 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBIISHI PLC program simullation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram HF-SE102BJW1-S100 HF-SE102BJW1-S100.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
HF-SE102BJW1-S100 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HF-SE102BJW1-S100&select=5