Category: Master station.
Transfer speed: 125kbps/250kbps/500kbps/1Mbps.
Transmission line form: bus system.
Total distance: 125kbps:1000m/250kbps:800m/500kbps:480m/1Mbps:240m.
The maximum connection units: 32.
Total points: input + output <=2048 point.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures MITSUBISHI HC-MFS/KFS43G1(1/20).
These procedures are relatively independent, generally in the basic completion of the program design and then add
HC-MFS/KFS43G1(1/20)
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations MITSUBISHI HC-MFS/KFS43G1(1/20). Industrial level switch hub.
NZ2EHG-T8 supports 10Mbps/100Mbps/1Gbps transfer rate .
With MDI/MDI-X Auto function, automatic negotiation function, etc..
The use of automatic power regulation function, can make up to a reduction of about 80%*2.
Do not use the cooling fan, but can be in a larger ambient temperature range (0 ~ 50 degrees C) normal operation MITSUBISHI HC-MFS/KFS43G1(1/20).
By using simple and easy loading and unloading DIN guide rail fixing mechanism, all kinds of installation can be easily carried out . 10Mbps transmission speed, the computer as the support of the flexible manufacturing system at the plant level, the requirements of more and more data flow,
High transmission speed can be guaranteed to increase the amount of transmitted data while maintaining the minimum time to transfer and receive data between programmable controllers.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect.
Switch volume control is designed to,
According to the currennt input combination of tthe switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order HC-MFS/KFS43G1(1/20).
So, sometimes also known as the order control.
And seqqueential control is divided into manual, semi-automatic or automatic HC-MFS/KFS43G1(1/20).
And the control principle is decentralized, centralized and hybrid control three.
HC-MFS/KFS43G1(1/20) Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HC-MFS/KFS43G1(1/20)&select=5