8 modules can be installed.
Input / output points: 256 points.
Number of input and output elements: 8192.
Program capacity: 10K step.
Processing speed: 0.12 s.
Program memory capacity: 40 KB.
Support USB and RS232.
Unable to install memory card.
Own floor 8 slot.
Ultra high speed processing, production time is shortened, better performance MITSUBISHI GT15-RS2T4-9P.
As applications become larger and more complex, it is necessary to shorten the system operation cycle time
GT15-RS2T4-9P
The operation period can be shortened by the super high basic operation speed 1.9ns.
In addition to achieve in the past with the control of single-chip high-speed control,
The system performance can be improved by reducing the total scan time,
To prevent any possible performance bias MITSUBISHI GT15-RS2T4-9P.
High speed and high precision data processing.
The processing speed of the real number (floating point) arithmetic has been greatly improved,
Addition instruction reached 0.014 mu s,
Therefore, it can support the request of high-speed, high-precision processing data processing MITSUBISHI GT15-RS2T4-9P.
In addition, the new addition of double precision floating point arithmetic instructions,
Simplify the programming, reduces the computational error when executing complex formula . Enter 16 points.
Voltage and current: 14mA DC24V.
Response time: 8ms.
16 point 1 public end, 20 point terminal.
Detailed analysis of the process and work characteristics of the controlled object,
To understand the coordination between the controlled object machine, electricity and liquid,
The control requirements of the controlled object for MITSUBISHI PLC control system are put forward,
Determine the control program, to develop a design task book.
How to determine the input / output device of MITSUBISHI plc.
According to the control requirements of the system,
All input devices and output devices required for the determination of the system,
To determine the input / output device related to the MITSUBISHI PLC,
To determine the I/O PLC points. Output points: 16 points.
Voltage: DC12/24V.
OFF leakage current: 0.1mA.
Output type: transistor output (type sink).
Response time: 2ms.
8 points / a common end.
20 point terminal station.
With heat protection.
With short circuit protection.
With the surge absorber.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC GT15-RS2T4-9P.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation GT15-RS2T4-9P.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
GT15-RS2T4-9P Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=GT15-RS2T4-9P&select=5