Output type: transistor output, drain type.
Output points: 32 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC12V/DC24V/0.5A.
External connection: 1 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup MITSUBISHI GT15-60ATT-96.
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool
GT15-60ATT-96 For MR-J2S-700A (4) /CP/CL or less.
Encoder adapter for HC-KFS; HC-MFS; 3000r/min HC-UFS servo motor MITSUBISHI GT15-60ATT-96. Servo motor series: ultra low inertia, low power .
Rated output: 0.05kw.
Rated speed: 3000r/min.
Electromagnetic brake: No.
Shaft end specification: Standard (straight axis).
Features: ultra low inertia is very suitable for high frequency operation.
IP level: IP65.
Application example:
1, insert machine.
2, assembly machinery.
Rotary servo motor.
Numerous motor series and wide motor power range can be used to meet different applications MITSUBISHI GT15-60ATT-96.
The protection level of the HF-KP/HF-MP/HC-LP/HC-RP/HC-UP servo motor to improve the environmental safety is IP65 (except the shaft part) . A set of 5 (LOGO removable, man-machine interface provides one).
Applicable model: A960GOT. 8 slots.
Requires 1 power modules.
Used to install the old section of the large A series PLC module.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Ceentralized output mode GT15-60ATT-96.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program too do the compiler to compile the process of interpretation GT15-60ATT-96.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
GT15-60ATT-96 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=GT15-60ATT-96&select=5