Board module installation location: QS series power module mounting slot.
Suitable substrate module: QS034B.
Input power: AC200~240V.
Security PLC (secure programmable system) refers to the self or external components or the implementation of the failure of the agency,
Can still respond to and promptly cut off the output of the programmable system MITSUBISHI A3NMCA-2.
Different from ordinary PLC, security PLC not only can provide the function of ordinary PLC,
Safe control function can be realized,
Meet the requirements of the ISO 13849-1 EN and IEC 61508 control system safety related component standards
A3NMCA-2
PLC security market mainstream has oilz (Pilz) PSS 3000, PSS 4000,
PSS 4000 in addition to the security process can also be processed outside the standard control procedures MITSUBISHI A3NMCA-2.
All the components in the security PLC adopt the redundancy structure,
Two processor processing for cross detection,
The processing results of each processor are stored in their respective memory,
Output is only when the processing result is in full agreement,
If any inconsistency occurs during the process, the system is immediately shut down MITSUBISHI A3NMCA-2. Output points: 32 points.
Voltage: AC100 ~ 240V.
OFF leakage current: 3mA.
Output type: bidirectional thyristor output.
Response time: 0.5Hz+1ms.
8 points / a common end.
50 point terminal station.
With the surge absorber.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeeting the conntrol requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC A3NMCA-2.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation A3NMCA-2.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
A3NMCA-2 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=A3NMCA-2&select=5