Servo motor series: low inertia, medium power.
Rated output: 0.5kw.
Rated speed: 2000r/min.
Electromagnetic brake: No.
Shaft end specification: Standard (straight axis).
Features: low inertia is widely used in general machinery.
IP level: IP65.
Application example:
1, roller type feeding equipment.
2, loading / unloading equipment MITSUBISHI GT2712-STWD-GF.
3, high frequency transmission system.
Abundant motor product line can optimize the performance of the machine
GT2712-STWD-GF
Has a rich motor product line including a rotary servo motor, linear servo motor and direct drive motor. Input voltage: AC100-240V.
Rated output: DC5V, 5A.
The power supply module is connected with the external power supply,
AnS programmable controller to provide the required DC5V,
They are inserted in the slot of the special power supply component on the base board,
The output of the DC5V is powered by the power supply on the substrate to the component MITSUBISHI GT2712-STWD-GF.
The input voltage of the component is related to the selected model.
A1S61PN/62PN has Deng generation A1S61P/A1S62P, A1S61PEU/A1S62PEU MITSUBISHI GT2712-STWD-GF. MR-J2M multi axis servo amplifier drive unit.
Rated output: 0 . 1kw.
Servo system is used to achieve the following purposes:
1, with a small power command signal to control the power load. Gun control and rudder control is a typical example.
2, in the absence of mechanical connection, the input shaft control is located in the distance of the output shaft, to achieve remote synchronous transmission.
3, so that the output of the mechanical displacement of the precise tracking of electrical signals, such as records and instructions, etc.. MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Plastic fiber cable -SI optical fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBIISHI PLC program siimulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram GT2712-STWD-GF GT2712-STWD-GF.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
GT2712-STWD-GF Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=GT2712-STWD-GF&select=5