Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 3 wire.
Spring clip terminal.
Do not need to be tightened further or locked with screws, which can reduce the working hours of wiring MITSUBISHI .
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module
F940GOT-SBD-H-E
When installing the module can choose to use the DIN guide rail or screw mounting.
Can be used for the 3 wire sensor input wiring. Input type: DC input, negative public end MITSUBISHI .
Input points: 16 points.
Enter the response time: 1.5ms the following .
Rated input voltage / current: DC24V/7mA.
External connection: 2~4 line type.
Waterproof connector type.
Strong waterproof type of IP67 protection grade.
No need to stop the system can be replaced module.
Without the use of tools can be a simple connection, save time.
Terminal resistor built-in.
Can be installed along the 6 direction MITSUBISHI .
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong .
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer. Cable length: 3m.
For MR-J2S-11KA (4) MR-J2S-22KA to (4). Output type: transistor output, drain type.
Output points: 16 points.
OFF leakage current: 0.25mA.
Output protection function.
Rated load voltage / current: DC12V/DC24V/0.5A.
External connection: 2 wire.
Waterproof connector type.
Strong waterproof type of IP67 protection grade.
No need to stop the system can be replaced module.
Without the use of tools can be a simple connection, save time.
Terminal resistor built-in.
Can be installed along the 6 direction.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a haard wired way, and the timelineess is strong MITSUBISHI F940GOT-SBD-H-E.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too gguarantee the timeliness MITSUBISHI F940GOT-SBD-H-E.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
F940GOT-SBD-H-E Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=F940GOT-SBD-H-E&select=5