LK Automation Limited LK Automation Limited
Brand Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Price
GT2708-STBA-GF MITSUBISHI GT2708-STBA-GF
MITSUBISHI GT2708-STBA-GF
Max input / output points: 128 points.
Supply voltage: 100 - 240VAC.
Input points: 64 points.
Output points: 64 points.
Output type: relay.
Power consumption: 100VA.
Weight (kg):1.8.
Size (WxHxD) mm:350x90x87.
Note recording function, Component annotation can be recorded in the program register.
Online program editor, online change the program will not lose the working hours or stop production operation GT2708-STBA-GF
RUN/STOP switch, running on panel / stop switch easy to operate.
Remote maintenance, remote programming software can monitor, upload or uninstall programs and data via modem communications
Password protection, using a eight digit password to protect your program MITSUBISHI GT2708-STBA-GF.
Clock function and hour meter function, all of the PLC FX2N has a real-time clock standard .
Continuous scanning function, to define the operation cycle for the application of the continuous scan time.
Input filter adjustment function, you can use the input filter to smooth the input signal (in the basic unit x000 to x017). Output points: 8 points MITSUBISHI GT2708-STBA-GF.
Output voltage and current: DC12/24V.
Output response time: 2ms.
8 point /1 a public side .
Output form: transistor output, leakage type.
24 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBIISHI PLC program siimulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram GT2708-STBA-GF GT2708-STBA-GF.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
GT2708-STBA-GF Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=GT2708-STBA-GF&select=5


...more relevant model market price >>>>
Related products
MITSUBISHI
8.4 Inch Touch Screen
GT2708-STBA-GF
MITSUBISHI 8.4 Inch Touch Screen GT2708-STBA-GF
Function: high performance and low price
MITSUBISHI
10.4 inch touch screen
GT2710-STBA-GF
MITSUBISHI 10.4 inch touch screen GT2710-STBA-GF
Function: high performance and low price
MITSUBISHI
8.4 Inch Touch Screen
GT2708-STBA
MITSUBISHI 8.4 Inch Touch Screen GT2708-STBA
Function: high performance and low price
MITSUBISHI
12.1 Inch Touch Screen
GT2712-STBA-GF
MITSUBISHI 12.1 Inch Touch Screen GT2712-STBA-GF
Function: high performance and low price