LK Automation Limited LK Automation Limited
Information sort OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Supply
Q80BD-J71LP21-25 MITSUBISHI Q80BD-J71LP21-25 High speed communication capable of communicating with 1Gbps Optical fiber loop (SI) module


Set high performance CNC and high speed programmable controller as a whole.
Integrating the high performance CNC with the high speed programmable controller helps to shorten the overall cycle time.
Support a rich variety of FA modules, can be flexible to meet the needs of different applications Q80BD-J71LP21-25.8 slots.
Requires 1 power modules.
Used to install llarge Q series modules.
Reduce system downtime recovery time.
With a simple operation, you can back up all the data in the CPU to the memory card Q80BD-J71LP21-25.
Through regular backup, can be the latest parameters, procedures, etc. to save the storage card.
In the event of a CPU failure, after the replacement of CPU, can be a simple operation,
Restore the system by using the data storage card in advance.
Therefore, it is not necessary to spend time to manage the backup data, but also can shorten the recovery time of the system shutdown Q80BD-J71LP21-25.
Wider application range, more advanced.
Leading in the era of the Q series CPU products.
Q series CPU products a wide range of applications,
Provide programmable controller, process, redundancy, C language, movement, manipulator, CNC all kinds of CPU,
In order to meet the needs of various control MITSUBISHI Q80BD-J71LP21-25.
Through the multi CPU configuration, can be based on the use of the scale, purpose,
Construction of the best system to meet the requirements of all kinds of control MITSUBISHI Q80BD-J71LP21-25.
In addition, the high reliability system can be constructed by the redundant system,
Even if a fault occurs, the system can continue to run.
PCI bus.
Support Japanese, English OS.
SI/QSI/H-PCF/ broadband H-PCF cable.
Dual loop controller network (control station / common station) MITSUBISHI Q80BD-J71LP21-25.
Make the mixed data environment intelligent, to achieve a new manufacturing system IE CC-Link field network module.
Using Ethernet cables and connectors available on the market to reduce costs.
High speed communication capable of communicating with 1Gbps.
Improve the communication response, significantly shorten the cycle time.
Improve the performance of cycle data update. Reduces the transmission delay time and the application of the synchronization waiting time.
Data can be read or written to other station programmable controller.
Status of IE CC-Link field network can be confirmed by Works2 GX.
Can be in the Works2 GX up and down the abnormal position, the cause of the exception, the event record,
So it can reduce the time of abnormal to resume normal operation.
Province distribution network module in cabinet and device.
Link to connect the 64 stations when the fastest scanning time for 1.2ms (rate 2.5Mbps).
According to the transmisssion distance, the transmission rate is selected from 2 Q80BD-J71LP21-25.5Mbps, 625kbps and 156kbps.
CC-Link/LT from the station does not need any parameter settings.
Only need to set up the transmission speed in the master module, you can use the remote I/O.

Related supply information