LK Automation Limited LK Automation Limited
Information sort OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Supply
MITSUBISHI A6TE2-16SR parts


RS-232C connection (micro computer connection).
Built in clock function.
Applicable models: A985 (-V) /975/970/960GOT. For A6TBXE/A6TBY36E/A6TBX54E/A6TBY54E/A6TBX70E (common cathode; source) long 1m.Enter 32 points.
2/5mA DC12/24V.
Response time: 10ms.
32 point 1 public.
Output 32 points A6TE2-16SR.
DC12/24V.
Leakage current: 0.1mA OFF.<
Response time: 1ms.
32 point 1 public.
Protection function.
Surge.
40 pin connector.
Switching value, also known as logic, refers to only two values, 0 or 1, ON or OFF A6TE2-16SR.
It is the most common control, it is the advantage of PLC control,
Is also the most basic application of PLC.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order A6TE2-16SR MITSUBISHI A6TE2-16SR.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic MITSUBISHI A6TE2-16SR.
And the control principle is decentralized, centralized and hybrid control three. A/D, D/A arbitrary set of unified 4 channel resolution: 1/2000
Input status and input information input from the input interface,
CPU will be stored in the working data memory or in the input image register MITSUBISHI A6TE2-16SR.
And then combine the data and the program with CPU.
The result is stored in the output image register or the working data memory,
And then output to the output interface, control the external drive.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
The working process of the input interface circuit: when the switch is closed, the diode light,
The transistor is then guided to the internal circuit and input signal under the irradiation of the light.
When the switch is off, the diode does not emit light, and the transistor is not on the way. Internal circuit input signal.
It is through the input interface circuit to the external switch signal into PLC internal can accept the digital signal.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internall storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process A6TE2-16SR.

Related supply information