LK Automation Limited LK Automation Limited
Information sort OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Supply
MITSUBISHI A0J2E-E56DR MITSUBISHI A0J2E-E56DR


DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
Output points: 8 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 8A/1 common end.
Output response time: 12ms A0J2E-E56DR.
8 point /1 a public side.
Output form: relay.<
40 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered A0J2E-E56DR.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system A0J2E-E56DR.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program MITSUBISHI A0J2E-E56DR.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation MITSUBISHI A0J2E-E56DR. QCPU (Q mode) bus connection.
1 joint.
Applicable models: A985 (-V) /975/970/960GOT.
A7HGP/A6GPP-CPU connection.
Length: 30m. Input type: DC input, positive common end.
Input points: 16 points MITSUBISHI A0J2E-E56DR.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/7mA.
External connection: 2~4 line type.
Waterproof connector type.
Strong waterproof type of IP67 protection grade.
No need to stop the system can be replaced module.
Without the use of tools can be a simple connection, save time.
Terminal resistor built-in.
Can be installed along the 6 direction.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The ssimulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness A0J2E-E56DR.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.

Related supply information