"X 10BASE-T/100BASE-T 1 channel.
No need to use PC to meet all the recording needs of the high-speed data recorder module.
High speed, simple, low cost, the accuracy of data records beyond the past.
Can be used to guide the form of a simple set of high speed data recorder module configuration tool",
And display the collected data with the trend chart,
Help to carry out data analysis, etc QY80 PDF datasheet
QY80 the recording data display / analysis tool "LogViewer GX"".
By accumulating all kinds of data in the production process,
Not only can help improve the quality of products, reduce production costs, but also for the optimization of the system,
Contribute to the construction of an efficient production site. "Master / local station sharing QY80 PDF datasheet .
Corresponding Ver2 CC-Link.
Consistency of CC-Link to maintain loop transmission,
And the cycle of transmission and information (instantaneous transmission) communication separately, so as to ensure the timeliness of.
Even if the information reaches saturation, it will not affect the link scan time.
The QJ61BT11N module supports CC-Link version 1 and version 2, which can be used as a local station or master station module QY80 PDF datasheet .
I/O control in the first class of open field network module.
CC-Link based on reliable field bus technology,
Able to transmit large number of bits data (such as ON/OFF information) and word data (such as analog information) MITSUBISHI QY80 PDF catalog. Input points: 32 points.
Input voltage and current: 4mA DC24V.
Response time: 1/5/10/20/70ms.
32 points and 1 common ends MITSUBISHI QY80 PDF catalog.
Common anode.
Output points: 32 points.
Output voltage and current: DC12-24V; 0.1A/ point; 2A/ common.
Response time: 1ms.
1 point 32 public end, leakage type; 40 pin connector.
With thermal protection.
With short circuit protection.
With the surge absorber.
With the help of sample tracking function, the starting time is shortened
By using the sampling and tracking function, it is convenient to analyze the data when the fault occurs,
Testing procedures for the time, etc MITSUBISHI QY80 PDF catalog. , can shorten the time of failure analysis and start-up time.
In addition, the multi CPU system also helps to determine the data transceiver time between the CPU module.
Can be used to analyze the data collected by programming tools,
In the form of charts and trend charts, the data changes of the bit soft element and the word soft element can be easily displayed.
And the sampling tracking results can be stored in LogViewer GX form CSV,
By recording data display and analysis tool LogViewer GX to display.
Ultra high speed processing, production time is shortened, better performance.
As applications become larger and more complex, it is necessary to shorten the system operation cycle time.
The operation period can be shortened by the super high basic operation speed 1.9ns.
In addition to achieve in the past with the control of single-chip high-speed control,
The system performance can be improved by reducing the total scan time,
To prevent any possible performance bias.
Convenient processing of large capacity data.
In the past can not achieve the standard RAM and SRAM card file register area of continuous access,
The boundary of each area should be considered in programming.
The SRAM 8MB extension card is installed in the high speed universal QCPU,
Standard RAM can be used as a continuous file register,
Capacity up to 4736K words, thus simplifying the programming.
Thus, even if the memory space of the soft element is insufficient,
Can also be installed by the expansion of SRAM card, easy to extend the file register area.
The address register is extended to 32 bits, which can be programmed to go beyond the traditioonal 32K word,
And to achieve the extension to the file register to all regions of the file register QY80 datasheet.
In addition, the processing speed of the index modification plays an important role in the efficient operation of structured daata (array),
The speed has been improved QY80 PDF datasheet .
When the index is used to modify the program repeatedly (e.g. from FOR to NEXT), the scan time can be reduced.