Series Name: A953GOT.
Size: 6 inches.
Resolution: 320 * 240.
Display device: STN monochrome display.
Display color: monochrome (white and black).
Power supply: DC24V.
The built-in RS-232 communication interface.
Memory card: 3M.
Design any machine interface, generally have to consider the system response time, user assistance mechanism, error information processing and command mode four aspects A953GOT-LBD datasheet
A953GOT-LBD
System response time is too long to be the most users in the interactive system,
In addition to the absolute length of the response time, the user is also very concerned about the difference in response to different commands in response time,
If too wide users will be difficult to accept; user assistance mechanism should be integrated,
Avoid overlay systems that cause users to turn to a guide and have to browse a large number of irrelevant information;
Error and warning information must be selected in terms of user''s clarity and meaning,
At the same time, it should be as far as possible to provide some suggestions on the recovery of errors A953GOT-LBD datasheet.
In addition, when the error message is displayed, the effect is better if it is supplemented by the auditory (Bell) and visual (special color) stimulus;
Command mode is the best menu and keyboard commands, for the user to choose A953GOT-LBD datasheet. Output type: transistor output, drain type.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 2 wire.
Sensor connector type (E-CON type).
Using industry standard E-CON type.
Simple wiring through sensor connector.
When installing the module can choose to use the DIN guide rail or screw mounting.
3 wire sensor input. Analog channel: 12 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/12 channel.
Analog module installation.
Power supply: AC85 ~ 132V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timmeliness is strong A953GOT-LBD PDF datasheet.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too guarantee the timeliness A953GOT-LBD PDF datasheet.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.