10BASE2.
For Q mode.
Control layer /MELSECNET/10 (H) is the middle layer of the whole network system,
Control network which is convenient and high speed processing data transmission between PLC, CNC and other control equipment.
As MELSEC control network MELSECNET/10,
With its good real-time performance, simple network settings, no procedures of the network data sharing concept,
As well as the redundant circuit and so on, has obtained the very high market appraisal,
The number of devices to reach the highest in japan,
In the world is also one of the few MITSUBISHI A7GT-CNB-RS4-1 PDF catalog
A7GT-CNB-RS4-1
And MELSECNET/H not only inherited the excellent characteristics of MELSECNET/10,
Also makes the network real-time better, more data capacity,
Further adapt to the needs of the market MITSUBISHI A7GT-CNB-RS4-1 PDF catalog. Cable length: 35 meters.
For QCPU and GOT (need A9GT-QCNB) connection.
For the connection between GOT and GOT. DC input points: 64 points.
Input voltage and current: 4/9mA, DC12/24V.
Response time: 107ms.
Positive pole sharing.
16 point /1 a public side.
Output points: 64 points.
Output voltage and current: DC12/24V, 100mA/1 point, 2A/1 common end.
Response time: (2I/O update time * 5) Ms MITSUBISHI A7GT-CNB-RS4-1 PDF catalog.
32 point /1 a public side.
Output form: transistor output, leakage type.
40 pin connector x 4.
Number of stations: 4 stops.
Compact remote I/O unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliiness is strong A7GT-CNB-RS4-1 PDF datasheet.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too guarantee the timeliness A7GT-CNB-RS4-1 PDF datasheet.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.