2 channels.
50kpps.
Count input signal: DC5/12/24V.
External input: DC5/12/24V.
Output: Transistor (open collector) 0.5A DC12/24V.
38 point terminal station.
How to determine the input / output device of MITSUBISHI plc.
According to the control requirements of the system,
All input devices and output devices required for the determination of the system,
To determine the input / output device related to the MITSUBISHI PLC,
To determine the I/O PLC points MITSUBISHI A65P PDF datasheet
A65P
Detailed analysis of the process and work characteristics of the controlled object,
To understand the coordination between the controlled object machine, electricity and liquid,
The control requirements of the controlled object for MITSUBISHI PLC control system are put forward,
Determine the control program, to develop a design task book MITSUBISHI A65P PDF datasheet. Input type: DC input, positive public end / negative public end.
Input points: 32 points.
Enter the response time: 0.2ms below, below 1.5ms, 5ms below, 10ms the following.
Rated input voltage / current: DC24V/7mA.
External connection: 1 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup MITSUBISHI A65P PDF datasheet.
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool. Interface: RS232C.
Transmission distance: 15 meters.
A1SJ71UC24-R2/R4/PR computer communication components can be relied on external intelligent devices such as computers and PLC for communication, the components are as follows:
Full / half duplex transmission,
4 special communication protocols,
No protocol and bidirectional mode,
Protocol selection switch function,
The optional baud rate, the highest 19.2K,
Since the echo diagnostic test. MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Plastic fiber cable -GI optical fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A65P PDF catalog A65P PDF catalog.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.