LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Manual Download >> A975GOT-TBA-CH
touch screen A975GOT-TBA-CH Introductory Manual Manual MITSUBISHI A975GOT-TBA-CH Operating Manual
Product model: A975GOT-TBA-CH
Name: touch screen
Brand: MITSUBISHI
Sort: Introductory Manual Operating Manual
File language: English
Input and output points: 1024 points.
Input / output data points: 1024 points.
Program capacity: 14K.
Basic command processing speed (LD command) s:0.20.
Coaxial data communication line function.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process A975GOT-TBA-CH Manual. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read A975GOT-TBA-CH
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three A975GOT-TBA-CH Manual.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage capacity: it is a measure of how much the user application can store the number of indicators A975GOT-TBA-CH Manual.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words MITSUBISHI A975GOT-TBA-CH Operating Manual. Data operation instructions for 2~4. Output type: transistor output, drain type.
Output points: 32 points.
OFF leakage current: 0 MITSUBISHI A975GOT-TBA-CH Operating Manual. 1mA.
Output protection function: No.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 1 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program MITSUBISHI A975GOT-TBA-CH Operating Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Output typee: transistor output, drain type A975GOT-TBA-CH Introductory Manual.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC12V/DC24V/0.5mA.
External connection: 2 wire.
Type of input and output termminal A975GOT-TBA-CH Manual.
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module.