LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Manual Download >> A975GOT-TBA-B
touch screen A975GOT-TBA-B Introductory Manual Operating Manual MITSUBISHI A975GOT-TBA-B Manual
Product model: A975GOT-TBA-B
Name: touch screen
Brand: MITSUBISHI
Sort: Introductory Manual Operating Manual
File language: English
Reader writer 2 channel connection, AnSCPU/QnASCPU.
PLC is the use of " sequential scanning, and constantly circulating " way to work.
That is, in the operation of CPU, PLC according to the user according to the control requirements of the coexistence of the user in the memory of the program,
According to the instruction sequence number (or address number) for periodic cyclic scan, such as no jump instruction,
From the first instruction to the user program execution sequence one by one, until the end of the program,
And then return to the first command, start the next round of the new scan, in the process of each scan,
Also complete the sampling of the input signal and the output status of the refresh and other work A975GOT-TBA-B Operating Manual A975GOT-TBA-B Operating Manual A975GOT-TBA-B
PLC is the use of " sequential scanning, and constantly circulating " way to work.
That is, in the operation of CPU, PLC according to the user according to the control requirements of the coexistence of the user in the memory of the program,
According to the instruction sequence number (or address number) for periodic cyclic scan, such as no jump instruction,
From the first instruction to the user program execution sequence one by one, until the end of the program,
And then return to the first command, start the next round of the new scan, in the process of each scan,
Also complete the sampling of the input signal and the output status of the refresh and other work A975GOT-TBA-B Operating Manual MITSUBISHI A975GOT-TBA-B Manual. DC input points: 16 points.
Input voltage and current: 3/7mA, DC12/24V MITSUBISHI A975GOT-TBA-B Manual.
Response time: 10ms.
Positive pole sharing.
16 point /1 a public side.
Output points: 12 points.
Output voltage and current: DC12/24V, 0.5A/1 point, 3.2A/1 common end.
Response time: 2ms.
8 point /1 a public end, 4 point /1 a public end.
Output form: transistor output, leakage type.
36 point terminal station MITSUBISHI A975GOT-TBA-B Manual.
Number of stations: 4 stops.
Compact remote I/O unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timelineess is strong A975GOT-TBA-B Introductory Manual.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too guarantee the timeliness A975GOT-TBA-B Operating Manual.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.