Cable length 0.6m; used in A6TE2-16SRN.Series Name: A953GOT.
Size: 6 inches.
Resolution: 320 * 240.
Display device: STN monochrome display.
Display color: monochrome (white and black).
Power supply: DC24V.
The built-in RS-232 communication interface.
Memory card: 3M.
Design any machine interface, generally have to consider the system response time, user assistance mechanism, error information processing and command mode four aspects A950GOT-TBD-M3 User's Manual
A950GOT-TBD-M3
System response time is too long to be the most users in the interactive system,
In addition to the absolute length of the response time, the user is also very concerned about the difference in response to different commands in response time,
If too wide users will be difficult to accept; user assistance mechanism should be integrated,
Avoid overlay systems that cause users to turn to a guide and have to browse a large number of irrelevant information;
Error and warning information must be selected in terms of user''s clarity and meaning,
At the same time, it should be as far as possible to provide some suggestions on the recovery of errors A950GOT-TBD-M3 User's Manual.
In addition, when the error message is displayed, the effect is better if it is supplemented by the auditory (Bell) and visual (special color) stimulus;
Command mode is the best menu and keyboard commands, for the user to choose A950GOT-TBD-M3 User's Manual. RS-232 1 channels MITSUBISHI A950GOT-TBD-M3 Manual.
With DC input 2 points.
Transistor output 2.
Number of stations: 1 stops.
Station type: intelligent equipment station.
MITSUBISHI PLC online debugging MITSUBISHI A950GOT-TBD-M3 Manual.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step MITSUBISHI A950GOT-TBD-M3 Manual.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiriing diagram and wiring diagram A950GOT-TBD-M3 Hardware.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program deesign and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced A950GOT-TBD-M3 User's Manual.