LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Manual Download >> A273UCPU
PLC A273UCPU Hardware User's Manual MITSUBISHI A273UCPU Manual
Product model: A273UCPU
Name: PLC
Brand: MITSUBISHI
Sort: Hardware User's Manual
File language: English
MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Twisted pair cable -GI optical fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations A273UCPU User's Manual.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system A273UCPU
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A273UCPU User's Manual. .
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation A273UCPU User's Manual. Screw, 2 piece type terminal.
Voltage output module.
Number of channels: 4 channels.
Number of stations: 2 stops.
Station type: remote equipment station.
High speed data transfer of up to 10Mbps;
The development of CC-LINK is not only to meet the control of high speed remote I/O,
But also to meet the high speed of the field of information control MITSUBISHI A273UCPU Manual MITSUBISHI A273UCPU Manual .
In order to achieve this goal, the transmission speed of CC-LINK is compared with that of the previous live network system to add 40 to 10Mbps.
Such a high speed can not affect the speed of the machine control while allowing a large number of data communication. Output points: 8 points MITSUBISHI A273UCPU Manual .
Output voltage and current: DC24V/AC240V, 2A/1 point, 5A/1 common end.
Response time: 12ms.
8 point /1 a public side.
26 point terminal station.
Number of stations: 1 stops.
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system.
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved.
Q series PLC in the use of CC-Link function better,
And easier to use.
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc..
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses.
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc.,
Information layer using the most common Ethernet.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA devices.
The Ethernet moodule has the function of Internet e-mail receiving and sending,
The user can send and receive the production information conveniently in any place of the world,
Build a remote monitoring management system A273UCPU Hardware.
At the same time, tthe use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information A273UCPU User's Manual.
Related products
MITSUBISHI
General purpose CPU
Q02UCPU
MITSUBISHI General purpose CPU Q02UCPU
Input / output points: 2048 points. Num
MITSUBISHI
CPU unit
A2UCPU
MITSUBISHI CPU unit A2UCPU
Input and output points: 512 points. Inp
MITSUBISHI
General purpose CPU
Q01UCPU
MITSUBISHI General purpose CPU Q01UCPU
Input / output points: 1024 points. Num