LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Manual Download >> AY70-UL
MITSUBISHI AY70-UL User's Manual AY70-UL Manual
Product model: AY70-UL
Name: PLC
Brand: MITSUBISHI
Sort: User's Manual
File language: English
Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 0.2ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC24V/0 AY70-UL User's Manual. 1A.
External connection: 1 line /1 line type.
40 pin connector type (FCN connector type) AY70-UL
Through the 40 pin connector type (FCN connector type) can be connected to a variety of devices.
Can be installed along the 6 direction.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong AY70-UL User's Manual.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer AY70-UL User's Manual. Input points: 32 points.
Voltage: AC200 ~ 240V.
Current: 12mA.
Response time: 25ms.
32 points / a common end.
38 point terminal station.
CE certification.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program AY70-UL Manual.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling AY70-UL Manual.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
Related products
MITSUBISHI
CMOS TTL output module
AY70
MITSUBISHI CMOS TTL output module AY70
Output points: 16 points. Voltage: DC5/1
MITSUBISHI
CMOS TTL output module
AY72
MITSUBISHI CMOS TTL output module AY72
Output points: 64 points. Voltage: DC5/1
MITSUBISHI
CMOS TTL output module
AY71
MITSUBISHI CMOS TTL output module AY71
Output points: 32 points. Voltage: DC5/1