LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Manual Download >> AJ72LP25
MITSUBISHI AJ72LP25 Reference Manual MELSECNET/10 Network System Manual
Product model: AJ72LP25
Name: MELSECNET/10 Network System
Brand: MITSUBISHI
Sort: Reference Manual
File language: English
Input and output points: 480 points.
Input / output data points: 480 points.
Program capacity: 8k.
Basic command processing speed (LD command) s:1.25.
RAM memory capacity: 32K, power supply.
Modular: PLC is the basic components of a separate module.
Medium and large PLC used this way. Easy maintenance AJ72LP25 Manual .
Relay output interface circuit of PLC
Working process: when the internal circuit output digital signal 1,
There is a current flowing through, the relay coil has a current, and then the normally open contact is closed,
Provide load current and voltage AJ72LP25
When the internal circuit outputs a digital signal 0, there is no current flowing through it,
The relay coil does not have a current, and the normally open contact is broken off,
A current or voltage that is disconnected from the load AJ72LP25 Manual .
It is through the output interface circuit to the internal digital circuit into a signal to make the load action or not action.
User program storage capacity: it is a measure of how much the user application can store the number of indicators.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words AJ72LP25 Manual . PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4. Analog channel: 16 channels.
Input / output (resolution): 0 ~ 4000 MITSUBISHI MELSECNET/10 Network System Manual .
Conversion speed: 100ms/16 channel.
Analog module installation.
Power supply: AC85 ~ 132V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program MITSUBISHI MELSECNET/10 Network System Manual .
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system MITSUBISHI MELSECNET/10 Network System Manual .
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, annd the timeliness is strong AJ72LP25 Reference Manual .
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too guarantee the timeliness AJ72LP25 Manual .
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
Related products
MITSUBISHI
Coaxial cable module
AJ72QLR25
MITSUBISHI Coaxial cable module AJ72QLR25
3C-2V/5C-2V coaxial cale. Doule loop.
MITSUBISHI
MELSECNET/B module
AJ72T25B
MITSUBISHI MELSECNET/B module AJ72T25B
Twisted pair cale. Single us. MELSECNE
MITSUBISHI
Network module
AJ72P25
MITSUBISHI Network module AJ72P25
SI-200/250 fier optic cale. Doule loo
MITSUBISHI
MELSECNET/MINI-S3 module
AJ72PT35
MITSUBISHI MELSECNET/MINI-S3 module AJ72PT35
Fier optic cale / twisted pair cale.