LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Manual Download >> A970GOT-LBA
MITSUBISHI A970GOT-LBA Manual A970GOT-LBA Hardware User's Manual
Product model: A970GOT-LBA
Name: Graphic Operation Terminal
Brand: MITSUBISHI
Sort: Hardware User's Manual
File language: English
Cable length: 30 meters.
For connection between GOT and CRT. Fiber optic cable / twisted pair cable.
Single bus.
Remote I/O station.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system A970GOT-LBA User's Manual A970GOT-LBA
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A970GOT-LBA User's Manual. . Input and output points: 2048 points.
Input / output data points: 2048 points.
Program capacity: 30K.
Basic command processing speed (LD command): with 1 s coaxial data communication line function.
Each scanning process A970GOT-LBA User's Manual. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage capacity: it is a meaasure of how much the user application can store the number of indicators A970GOT-LBA Manual.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General llogical operation instructions each account for 1 words A970GOT-LBA Manual. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.
Related products
MITSUBISHI
10 inch man machine interface
A970GOT-TBA-EU
MITSUBISHI 10 inch man machine interface A970GOT-TBA-EU
Series Name: A975GOT. Size: 10 inches. R
MITSUBISHI
10 inch man machine interface
A970GOT-SBA-EU
MITSUBISHI 10 inch man machine interface A970GOT-SBA-EU
Series Name: A975GOT. Size: 10 inches. R
MITSUBISHI
10 inch man machine interface
A970GOT-TBD-B
MITSUBISHI 10 inch man machine interface A970GOT-TBD-B
Series Name: A975GOT. Size: 10 inches. R
MITSUBISHI
10 inch man machine interface
A970GOT-LBA
MITSUBISHI 10 inch man machine interface A970GOT-LBA
Series Name: A975GOT. Size: 10 inches. R