LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Manual Download >> A3ACPUP21
MITSUBISHI A3ACPUP21 Manual A3ACPUP21 Hardware User's Manual
Product model: A3ACPUP21
Name: PLC
Brand: MITSUBISHI
Sort: Hardware User's Manual
File language: English
SI-200/250 fiber optic cable.
Double loop.
MELSECNET (II) (remote I/O station).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system A3ACPUP21 User's Manual A3ACPUP21
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A3ACPUP21 User's Manual. . 10BASE-T
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process A3ACPUP21 User's Manual.
When the programmer input programinto the user program memory,
Then CPU according to the function of the system (the system program memory to explain the compiler),
Translate the user program into PLC internally recognized by the user to compile the program. 5 slots.
Can be installed in the power supply unit for A series units installed QnA/.
Relay output interface circuit of PLC
Working process: when the internal circuit output digital signal 1,
There is a current flowing through, the relay coil has a current, and then the normally open contact is closed,
Provide load current and voltage.
When the internal circuit outputs a digital signal 0, there is no current flowing through it,
The relay coil does not have a current, and the normally open contact is broken off,
A current or voltage that is disconnected from the load.
It is through the output interface circuit to the internal digital circuit into a signal to make the load action or not action.
I/O points is an important indicator of PLC.
Reasonable selection of I/O points can not only satisfy the control requirements of the system,
And the total investment of the system is the lowest.
The input and output points and types of PLC should be determined accorrding to the analog quantity and switch quantity of the controlled object,
Generally an input / output element to take up an input / output point A3ACPUP21 Manual .
Taking into account the future adjustment and expansion,
In general should be estimaated on the total number of points plus the amount of spare 20%~30% A3ACPUP21 Manual .
The following describes the centralized control system I/O points of the estimate.
Related products
MITSUBISHI
CPU unit
A2CCPUP21
MITSUBISHI CPU unit A2CCPUP21
Input and output points: 512 points. Inp
MITSUBISHI
CPU unit
A3ACPUR21
MITSUBISHI CPU unit A3ACPUR21
Input and output points: 2048 points. In
MITSUBISHI
CPU unit
A2ACPUP21
MITSUBISHI CPU unit A2ACPUP21
Input and output points: 512 points. Inp
MITSUBISHI
CPU unit
A0J2HCPUP21
MITSUBISHI CPU unit A0J2HCPUP21
Input and output points: 480 points. Inp