LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Manual Download >> A2ACPU-S1
MITSUBISHI A2ACPU-S1 Programming Manual A2ACPU-S1 Fundamentals Manual
Product model: A2ACPU-S1
Name: PLC
Brand: MITSUBISHI
Sort: Fundamentals Programming Manual
File language: English
Parallel printer connection (1CH).
Applicable models: A95_ (-M3) /A956WGOT. Input and output points: 2048 points.
Input / output data points: 2048 points.
Program capacity: 30K.
Basic command processing speed (LD command) s:1.0.
Optical data communication line.
Each scanning process. Focus on the input signal sampling A2ACPU-S1 Programming Manual. Focus on the output signal to refresh.
Input refresh process A2ACPU-S1 When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program A2ACPU-S1 Programming Manual.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage capacity: it is a measure of how much the user application can store the number of indicators A2ACPU-S1 Programming Manual.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4. Special multi axis positioning controller for NSD servo system.
Program capacity: Max 60K step.
Input / output points: 1920 points.
Control AC motor required I/O points with PLC control AC motor,
Signal and feedback signal is used as the input signal of PLC,
The control of AC motor is accomplished by using the output signal of PLC to drive the contactor.
For example, the AC motor is controlled by a Y- delta starting with PLC,
Generally need to occupy 4 of the PLC input and 3 output points,
PLC control of a one-way operation of the cage type motor,
4 input points and 1 output points are occupied, and a reversible motor is controlleed,
5 input points and 2 output points are needed to control a unidirectional operation of variable pole speed control motor,
5 input points and 2 output points are required to control a unidirectional operation of the rotor AC mottor,
3 input points and 4 output points are needed to control a reversible running winding rotor AC motor,
Requires 4 input points and 5 output points A2ACPU-S1 Manual A2ACPU-S1 Manual .
Related products
MITSUBISHI
CPU unit
A2ACPUP21-S4
MITSUBISHI CPU unit A2ACPUP21-S4
Input and output points: 1024 points. In
MITSUBISHI
CPU unit
A2SCPU-S1
MITSUBISHI CPU unit A2SCPU-S1
Program memory capacity 14K. Input and o
MITSUBISHI
CPU component
A2SHCPU-S1
MITSUBISHI CPU component A2SHCPU-S1
I/O control method: refresh mode or dire