MITSUBISHI A1SJ71QC24N1 Manual A1SJ71QC24N1 Hardware User's Manual
Product model: A1SJ71QC24N1
Name: Serial Communication Module
Brand: MITSUBISHI
Sort: Hardware User's Manual
File language: English
Input type: DC input, negative public end.
Input points: 8 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/7mA.
Output form: transistor output, source.
Output points: 8 points.
OFF leakage current: 0.3mA.
Output protection function.
Rated load voltage / current: DC24V/1 A1SJ71QC24N1 User's Manual. 0A.
External connection: /2 line 2~4 line type.
Waterproof connector type A1SJ71QC24N1
Strong waterproof type of IP67 protection grade.
No need to stop the system can be replaced module.
Without the use of tools can be a simple connection, save time.
Terminal resistor built-in.
Can be installed along the 6 direction.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong A1SJ71QC24N1 User's Manual.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer A1SJ71QC24N1 User's Manual. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
8 point /1 a public side.
Positive pole sharing.
Output points: 8 points.
Output voltage and current: DC24V.
Output response time: 2ms.
8 point /1 a public side.
Output form: transistor output, leakage type.
40 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simuulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A1SJ71QC24N1 Manual A1SJ71QC24N1 Manual .
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.