Output type: transistor output, drain type.
Output points: 32 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 1 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction A1SJ71QBR11 User's Manual.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program
A1SJ71QBR11
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation A1SJ71QBR11 User's Manual. DC input points: 16 points.
Input voltage and current: 3/7mA, DC12/24V.
Response time: 10ms.
Positive pole sharing.
16 point /1 a public side.
Output points: 12 points.
Output voltage and current: DC12/24V, 0.5A/1 point, 3.2A/1 common end.
Response time: 2ms.
8 point /1 a public end, 4 point /1 a public end.
Output form: transistor output, leakage type.
36 point terminal station.
Number of stations: 4 stops A1SJ71QBR11 User's Manual.
Compact remote I/O unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timmeliness is strong A1SJ71QBR11 Manual .
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too guarantee the timeliness A1SJ71QBR11 Manual .
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.