Manual Download >> AJ35TJ-8A
AJ35TJ-8A Manual MITSUBISHI AJ35TJ-8A User's Manual
Product model: AJ35TJ-8A
Name: I/O MODULE
Brand: MITSUBISHI
Sort: User's Manual
File language: English
Cable 0.6m for the expansion of the floor, the expansion of a floor for every 1 units.CC-link remote device station.
CC-link/LT master function.
Consumption current: 75mA (DC24V, power supply through the power adapter)
Current at startup: 165mA (DC24V, power supply through the power adapter)
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc MITSUBISHI AJ35TJ-8A User's Manual AJ35TJ-8A .
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses.
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc MITSUBISHI AJ35TJ-8A User's Manual. ,
Information layer using the most common Ethernet.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA devices.
The Ethernet module has the function of Internet e-mail receiving and sending,
The user can send and receive the production information conveniently in any place of the world,
Build a remote monitoring management system MITSUBISHI AJ35TJ-8A User's Manual.
At the same time, the use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information. Fast connector type.
Voltage output.
Number of channels: 8 channels.
Occupied the number of stations: Ver.1 mode occupied 3 stations, Ver.2 mode occupied 1 stations.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on--line unification to adjust AJ35TJ-8A Manual .
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step AJ35TJ-8A Manual .
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.