LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Manual Download >> A970GOT-SBD
A970GOT-SBD User's Manual MITSUBISHI A970GOT-SBD Hardware Manual
Product model: A970GOT-SBD
Name: touch screen
Brand: MITSUBISHI
Sort: Hardware User's Manual
File language: English
Input points: 16 points.
Voltage: DC100/110/125V.
Current: 2mA.
Response time: 20ms.
8 points / a common end.
Positive / negative sharing.
20 point terminal station.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read MITSUBISHI A970GOT-SBD Manual A970GOT-SBD
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three MITSUBISHI A970GOT-SBD Manual.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive MITSUBISHI A970GOT-SBD Manual.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear. PLC station distance: 1Km.
Cable type: QSI-200/250.
The function of the MELSECNET interface module is to connect the main CPU PLC to the MELSECNET data communication system.
As long as the switch on the component to set, you can determine the CPU PLC is as a main station or in situ station.
There are two modules available for selection: one is the connection of the optical cable network and the network of the coaxial cable.
For a ANSCPU, up to only a piece of interface components can be inserted, A2ASCPU can be inserted 2.
The popularization and application of PLC programming has been developed rapidly in our country,
It has been widely used in all kinds of mechanical equipment and production process of electrical control devices,
All walks of life have emerged a large number of application of PLC transformation of the results of the equipment.
Understand the working principle of PLC, have the ability to design, debug and maintain the PLC control system,
Has become the basic requirements of modern industry for electrical technicians and engineering students.
The instruction list programming language is a programming language similar to assembly language mnemonic,
As well as assembly language by the operation code and the number of operations.
In the case of the computer for the PLC handheld programmer compile user program.
At the same time, the programming language of the instruction list corresponds to the ladder diagram programming language,
In PLC programming software can be converted to each other. Figure 3 is the instruction sheet corresponding to the ladder diagram of figure 2PLC.
The characteristics of instruction table programming language is used to represent mnemonic operation function,
Easy to remember, easy to grasp;
In the handheld programmer on the keyboard using the mnemonic representation, easy to operate, can be programmed in computer;
There is a one-tto-one correspondence between the ladder diagram and the ladder diagram A970GOT-SBD User's Manual A970GOT-SBD User's Manual. Its characteristics are basically consistent with the ladder diagram language.
Related products
MITSUBISHI
10 inch man machine interface
A970GOT-LBA-EU
MITSUBISHI 10 inch man machine interface A970GOT-LBA-EU
Series Name: A975GOT. Size: 10 inches. R
MITSUBISHI
10 inch man machine interface
A970GOT-SBA-EU
MITSUBISHI 10 inch man machine interface A970GOT-SBA-EU
Series Name: A975GOT. Size: 10 inches. R
MITSUBISHI
6 inch man machine interface
A953GOT-SBD
MITSUBISHI 6 inch man machine interface A953GOT-SBD
Series Name: A953GOT. Size: 6 inches. Re
MITSUBISHI
10 inch man machine interface
A970GOT-LBD
MITSUBISHI 10 inch man machine interface A970GOT-LBD
Series Name: A975GOT. Size: 10 inches. R