Series Name: A956GOT.
Size: 6 inches.
Resolution: 320 * 240.
Display equipment: high brightness TFT color display.
Display color: 256 color.
Power supply: DC24V.
Memory card: 1M.
The external model design model of creating the system function is mainly to consider the data structure, the overall structure and the process description of the software,
The interface design is usually only used as accessories, only on the user''s situation (including age, gender, mental status, education level, personality, ethnic background and etc MITSUBISHI A951GOT-SBD-M3 User's Manual
A951GOT-SBD-M3 ) to understand, to design an effective user interface;
According to the user model of the future system of the end user (for short),
In the end, it is consistent with the system image (external characteristic) of the system after the system is realized,
Users can be satisfied with the system and be able to use it effectively;
When the user model is established, the information given by the system should be considered,
System mapping must accurately reflect the syntax and semantic information of the system MITSUBISHI A951GOT-SBD-M3 User's Manual.
In short, only to understand the user, to understand the task in order to design a good man-machine interface MITSUBISHI A951GOT-SBD-M3 User's Manual. Transmission line unit for MELSECNET/MINI (-S3) twisted pair data link.
Loop: twisted pair I/F.
Remote station: twisted pair line I/F.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simullation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A951GOT-SBD-M3 Manual A951GOT-SBD-M3 Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.