LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Manual Download >> A3NCPUP21-S3
A3NCPUP21-S3 Manual MITSUBISHI A3NCPUP21-S3 Common Instructions Programming Manual
Product model: A3NCPUP21-S3
Name: Programmable Logic Controller
Brand: MITSUBISHI
Sort: Common Instructions Programming Manual
File language: English
RS-232 1 channel.
RS-422/485 1 channel.
Transmission speed: 2 channels.
At the same time the use of 115.2kbps may.
When the programmer input programinto the user program memory,
Then CPU according to the function of the system (the system program memory to explain the compiler),
Translate the user program into PLC internally recognized by the user to compile the program MITSUBISHI A3NCPUP21-S3 Programming Manual A3NCPUP21-S3
Input status and input information input from the input interface,
CPU will be stored in the working data memory or in the input image register.
And then combine the data and the program with CPU.
The result is stored in the output image register or the working data memory,
And then output to the output interface, control the external drive MITSUBISHI A3NCPUP21-S3 Programming Manual .
Semiconductor circuit with memory function.
System program memory and user memory.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
User memory: user program storage area and work data storage area MITSUBISHI A3NCPUP21-S3 Programming Manual .
Composed of random access memory (RAM). User use.
Power cut off. Commonly used efficient lithium battery as a backup power supply, life is generally 3~5 years. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
Output points: 8 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 8A/1 common end.
Output response time: 12ms.
8 point /1 a public side.
Output form: relay.
40 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simmulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A3NCPUP21-S3 Manual A3NCPUP21-S3 Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
Related products
MITSUBISHI
CPU unit
A3ACPUP21-S3
MITSUBISHI CPU unit A3ACPUP21-S3
Input and output points: 2048 points. In
MITSUBISHI
CPU unit
A3NCPU
MITSUBISHI CPU unit A3NCPU
Input and output points: 2048 points. In
MITSUBISHI
CPU unit
A2ACPUP21-S3
MITSUBISHI CPU unit A2ACPUP21-S3
Input and output points: 512 points. Inp
MITSUBISHI
CPU unit
A3NCPUP21-S3
MITSUBISHI CPU unit A3NCPUP21-S3
Input and output points: 2048 points. In