Input type: DC input, positive common end.
Input points: 32 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 3 wire.
Sensor connector type (E-CON type).
Using industry standard E-CON type.
Simple wiring through sensor connector A1SD35ID1.
When installing the module can chhoose to use the DIN guide rail or screw mounting.
3 wire sensor input. Description: can form up to 8 of the star wiring, as well as the maximum length of the application of the transmission line distribution, waterproof (IP67) structure A1SD35ID1.
Spare 5 products for different purposes.
Thin waterproof type relay hub.
Extension of star type wiring and main line length, waterproof structure MITSUBISHI A1SD35ID1.
Spring clip terminal type relay hub A1SD35ID1.
Star type wiring, length of the main line, spring clamping terminal table type.
Relay appliance (T branch) unit.
Extension of T type branch and trunk length.
Relay unit in light.
In the presence of interference in the environment of the wiring, the length of the trunk line MITSUBISHI A1SD35ID1.
Relay unit in space light.
Communication between linear moving bodies. Fast connector type.
Voltage input.
Number of channels: 8 channels.
Occupied the number of stations: Ver MITSUBISHI A1SD35ID1.1 mode occupied 3 stations, Ver.2 mode occupied 1 stations.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and thhen connect the output device, and then connect to the actual load and so on and so on step by step A1SD35ID1.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.