AJ65SBTW4-16DT MITSUBISHI Waterproof connector type DC input / transistor output module AJ65SBTW4-16DT


Output type: transistor output, drain type.
Output points: 32 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 1 wire.
Fast connector type.
Simple wiring through quick connector AJ65SBTW4-16DT.
Can be installed along the 6 direction.
MITSUUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program AJ65SBTW4-16DT.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Input type: DC input, positive public end / negative public end AJ65SBTW4-16DT.
Input points: 8 points.
Enter the response time: 10ms the following.
Rated input voltage / current: DC24V/7mA.
Output form: relay output.
Output points: 8 points.
OFF leakage current: -.
Output protection function: No.
Rated load voltage / current: DC12V/AC240V/2A MITSUBISHI AJ65SBTW4-16DT.
External connection: 2 line /2 line type.
Type of input and output terminal.
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module.
Enter 8 points: 24VDC MITSUBISHI AJ65SBTW4-16DT.
4 wire type.
Response time: 1.5ms.
Output 8 points: 24VDC.
Transistor output.
Waterproof connector type.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram MITSUBISHI AJ65SBTW4-16DT.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and thhen connect the output device, and then connect to the actual load and so on and so on step by step AJ65SBTW4-16DT.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.

Related supply information